Sodium Silicate
Plant
An Indian consultancy company offers to
supply sodium silicate plant on turnkey basis. The conventional
process of manufacturing sodium silicate is by the reaction
of silica sand with soda ash at about 1,100oC forming water
glass, which is crushed & dissolved in water and digested
under pressure with steam.
The process offered by the company involves reaction of silica
present in rice husk ash and caustic soda in an autoclave
under pressure with steam. Rice husk contains appreciable
quantity of silica and on burning the husk contains appreciable
quantity of silica and on burning the husk for raising steam
in the boiler, the ash obtained is mostly silica in highly
reactive form. The solution of sodium silicate so formed on
pressure digestion is filtered from the unreacted, unburnt
carbon particles originally present in the ash and finally
concentrated in an evaporator.
Equipment Required :
The list of main equipment required for
production silicated are as follows: vibrating screen (1 number),
digestor (2 number), filter press- plate and frame type (1
number), evaporator (2 number), condensers (2 number), boiler
(1 number), transfer pump with softener (1 number), cooling
tower with ID fan (1 number), NaOH solution preparation tank
(1 number), NaOH solution measuring tank (1 number), filter
feed tank (1 number), bleacher feed tank (1 number), soft
water storage tank (1 number), chimney for boiler (1 number),
interconnecting pipelines for steam and process fluids (1
number), technological structure (1 set)
Areas of Application:
In Chemical industry. It is used in soaps, detergents, adhesives
silica gel, etc
Inputs Required:
- Raw materials
- Caustic soda flakes: 215 kgs/ton of sodium silicate
- Rice husk: 1,675 kgs/ton of sodium silicate
- Rice husk ash: 135 kgs/ton of sodium silicate
- Chlorine gas: 3.5 kgs/ton of sodium silicate
- Water: 2.5 cubic meters per ton of
sodium silicate
- Electricity: 25 HP connected load
- Manpower: 8 nos per shift
Production capacity
: 1,500 MT per annum based on 2 shift/day operation.
Economic Data: Cost of project
(excluding land, shed & building): Rs 7 million (US $
0.145 million approximately).
Forms of Transfer
: Turnkey plant