An entrepreneur has to obtain several clearances or permission
depending upon the nature of his unit and products manufactured.
Regulatory Or Taxation Clearances
- Registration under Sales Tax Act - Commercial Tax officer
of area concerned
- Registration under Central Excise Act - Collector of
Central Excise or his nominee for area
- Payment of Income Tax - ITO of the area concerned
- Registration of Partnership deed - Inspector General
of area concerned
- Calibration of weights & measures - Weights and Measures
Inspector of State
- Power Connection - Designated Officer of State Electricity
Board
- Employee strength exceeding 10 with power connection
or 20 without power - Chief Inspector of Factories
Environment And Pollution Related Clearances
1. Pollution Control - State
Pollution Control Board. A No Objection Certificate (NOC)
should be obtained from the State Pollution Control Board
before commencement of construction activity. In case the
industry is of the highly polluting category, a full-fledged
or rapid Environmental Impact Assessment(EIA) study has to
be carried out and submitted to the State Pollution Control
Board for approval, after which the construction can commence.
2. Industries Requiring Water and
Affecting Effluent Disposal - State Pollution Control
Board No Objection Certificate (NOC) should be obtained from
the State Pollution Control Board before commencement of construction
activity.
3. For units functioning outside
Industrial Area - Permission from Municipal Corporation/
Municipality/ Panchyat. In case private agricultural land
is purchased for the project, the land would have to be rezoned
as industrial zone. Permission to convert such agricultural
land to industrial area would have to be obtained before the
actual start of the construction from the local office of
the Directorate of Town & Country Planning.
4. Registration and Licensing of
a Boiler - Chief Inspector of Boiler. The safety clearance
of the Chief Electrical Inspector and the Chief Inspector
of Boilers are required before commencing operations with
electrical and pressure vessels(boilers) respectively.
5. For registration as a 100% export oriented unit (EOU)
which can enjoy many additional concessions, the clearance
of the Development Commissioner of the Export Processing Zone
(EPZ) would be required. If the company wishes to offer equity
shares to the public, the clearance of the Stock Exchange
Board of India (SEBI) has to be taken.
Product Specific Clearances
- Establishing a Printing Press
- District Magistrate
- License for Cold Storage
Construction - Designated Official in State
- Pesticides - Central/State
Agricultural Department - Ministry of Agriculture
- Drugs and Pharmaceuticals -
Drug license from State Drug Controller
- Safety Matches/ Fireworks
- License under Explosives Act from Directorate of Explosives,
Nagpur
- Household Electrical Appliances
- License from Bureau of Indian Standards
- Wood Working Industry
within 8 km from forest - District Forest Officer
- Milk Processing & Milk
products manufacturing units - Approval under Milk
and Milk Products Order from State Agricultural/ Food Processing
Industries Department above a designated capacity.
|